Recent Posts

AI agents

How should managers manage AI agents?

Main Managing an AI agent means granting only the independence whose consequences the organization can verify and, when necessary,

How should managers manage AI agents?

Main

Managing an AI agent means granting only the independence whose consequences the organization can verify and, when necessary, stop. BTU’s analytical assessment is that management quality depends less on the number of approvals than on whether the right issue reaches the responsible person in time.

Key takeaways

  • An AI agent’s independence should reflect the consequence and reversibility of each action, alongside the organization’s actual ability to supervise it.
  • Preparing research, sending a customer response and creating a financial commitment require different oversight even when one agent performs all three tasks.
  • Managers should assess useful work completed, including verification and correction costs; fast responses alone do not establish that benefit.

A manager asks an agent to identify suppliers and compare their offers. A table appears within minutes. Yet several questions remain. Do the prices cover the same service? Are delivery dates confirmed? Are the offers still valid? Did the agent simply gather information, or did a supplier receive a message that sounded like an order?

The quality of the final prose cannot answer all of these questions. An agent capable of acting requires a manager to understand what happened on the organization’s behalf. A clear assignment gives the agent direction. Ongoing supervision establishes whether execution still serves the purpose the person intended.

BTU’s assessment is that the difficult part is placing control where it matters. If a manager repeats every technical check, delegated work returns to their desk. If the manager reads only a polished final report, a consequential action may already have created a cost, a promise or a mistake.

Manage actions rather than a general feeling of trust

One assignment can involve reading public information, comparing figures, changing a working file, messaging a partner and starting an application. These actions have different consequences. A general declaration that an agent is trusted cannot substitute for operational boundaries.

A market review may allow considerable independence if its sources remain checkable. A customer message needs agreed limits on what may be communicated. Moving money or accepting a significant obligation calls for stronger control. This is a management principle, not a substitute for the particular rules governing regulated activity.

Reversibility matters too. An internal working note can often be corrected easily. A promise sent outside the organization cannot be withdrawn merely by deleting a file. Supervision should therefore become more demanding when internal preparation turns into an external consequence. The manager needs visibility before that transition, not just a summary afterwards.

Specific boundaries also help the agent. “Be careful about everything” provides little guidance. “Prepare the comparison, but do not accept an offer or confirm anything to a supplier” is clearer. Where supported, tool permissions can turn the instruction into an enforced boundary. A textual instruction alone is not equivalent to technical access control.

Define what completion would look like

A common management failure is explaining the subject of a task without defining a satisfactory result. “Analyze sales” could produce charts, a lengthy report or one targeted answer. If the manager really wants to understand declining repeat orders, the relevant evidence and checks are different.

An acceptance condition need not prescribe every step. It can state what must be established, what may remain uncertain and which considerations determine the decision. In supplier selection, the lowest opening price may matter less than total cost, delivery reliability and compliance with quality requirements.

For research, completion may mean an evidenced conclusion accompanied by unresolved questions. For operational work, it requires an execution trace: what changed, where the change can be observed and what confirmation exists. “Done” is a claim, not its own evidence. A service accepting a message, a record being saved and a recipient actually receiving a service are distinct states.

This calls for short but informative reporting. A long activity log can overwhelm attention; a short celebration can conceal material gaps. A useful report distinguishes completed work, limitations, changed circumstances and the decision that still belongs to a person.

One good demonstration is insufficient

The original 2024 τ-bench study combined simulated-user dialogue, tool use and policy compliance. It assessed final database states and used repeated trials to examine consistency. The paper supplies a useful evaluation method, not a current estimate of every agent’s performance. [1]

The managerial implication is to test a range of actual work conditions. Ordinary requests matter, but so do missing information, conflicting instructions and changes during execution. An agent might handle a standard order correctly yet miss an address change introduced midway through the conversation. A favorable average cannot erase that specific failure.

Evaluation should distinguish substantive accuracy from compliance with boundaries. A correct amount does not justify sending it to the wrong recipient. A customer problem might be resolved through a promise the company never authorized. A single aggregate score can hide both kinds of problems.

Managers also need some review of apparently successful cases. Waiting for complaints reveals only errors that somebody noticed and challenged. An unfinished task or a misread source can remain invisible. The intensity of checking should adapt to the actual risk and the evidence accumulated in use.

Make human involvement useful

Escalating an issue to a person can be successful execution. An agent should stop when important information is missing, rules conflict or the next action exceeds its authority. But frequent trivial questions are also costly. They consume attention and can train managers to approve without reading.

Anthropic’s February 2026 observational study found that experienced Claude Code users used automatic approvals more often while also interrupting more often. This was one provider’s predominantly programming context. It describes an oversight pattern; it does not prove that greater autonomy is safe across businesses. [2]

A useful escalation explains why work stopped and what decision is needed. “Two sources give different delivery dates; we need the supplier’s confirmation before placing an order” moves the task forward. A vague “What should I do?” can simply return the thinking burden to the manager.

Timing matters. If the responsible person is unavailable, the agent needs to know whether to wait, continue independent parts or stop the process. Silence should not become consent merely because unattended operation is convenient. Not every delay warrants expanding the agent’s authority.

Work situation Management purpose Useful control
Internal comparison of public information Establish accuracy Check sources and important discrepancies
An agreed category of external reply Protect meaning and recipient accuracy Defined scope and escalation of exceptions
A new financial or reputational commitment Prevent an unauthorized consequence Decision by the authorized person before action
Uncertain execution status Avoid harm through repetition Check the outcome before deciding to retry

This table is BTU’s analytical classification, not an experimental result or a universal legal rule.

Turn errors into organizational learning

“Be more careful” is rarely a sufficient response to failure. The cause matters. Was information missing? Was an old rule applied? Did similar names refer to different tasks? Did a tool return an error? Had the manager failed to define the boundary clearly?

Different causes require different remedies. An outdated reference needs updating. An ambiguous permission needs clarification. A repeatedly harmful action may require a technical restriction. An extra instruction sometimes helps; in other cases, it adds another contradiction. A larger rule collection is not necessarily a more coherent one.

NIST’s voluntary AI Risk Management Framework covers testing before and during use, feedback, intervention and recovery. It is a management reference rather than an automatically binding Georgian requirement. [3]

In practical management, a discovered failure should become part of future checking. After changing a model, tool or organizational rule, revisit cases that previously caused problems. Otherwise, a team repeatedly pays for the same lesson in lost time and trust.

Questions and answers

Must a manager approve every action? No. Oversight should match consequence, authority and reversibility. Low-risk internal work and external commitments should not share an undifferentiated approval rule.

Do frequent questions mean an agent is performing badly? Not necessarily. The test is whether questions resolve important uncertainty or repeatedly reopen already settled details.

Is choosing a powerful model enough? No. Even a capable model needs current information, action boundaries, outcome verification and improvement after failure.

When does an agent create real value? When useful work is completed at acceptable quality and risk, without supervision and correction consuming the benefit.

Research basis

Question: How should a manager supervise active AI agents without duplicating their work or overlooking important actions?

Method: Comparative theoretical synthesis of primary sources, separating accuracy, authority, reversibility and timely intervention. Georgian examples are explanatory.

Evidence and periods: The 2024 τ-bench method; Anthropic’s February 2026 observation; NIST’s 2023 voluntary framework. Sources checked on 16 November 2026; links below and in the appendix.

Conclusion: BTU’s analytical assessment favors placing controls at consequential transitions over merely increasing approval counts. This recommendation requires local outcome validation.

Boundary: No new experiment, Georgian productivity estimate or platform-specific security assessment was conducted.