The hidden change in Georgia’s electricity balance

Main summary

BTU’s calculations show that about 83% of the increase in Georgia’s net electricity imports in January–September 2026 reflects lower exports, while 17% reflects higher imports. Comparing domestic generation, consumption and the production mix explains why neither the volume of imported electricity nor the announced capacity of new plants is sufficient to describe the system’s position.

Main conclusions

  • Georgia’s net electricity imports, defined as imports minus exports, increased from 621.9 million kWh in January–September 2025 to 936.5 million kWh in the corresponding 2026 period. BTU calculates that reduced exports account for 260.8 million kWh of the 314.6 million kWh deterioration.
  • BTU’s comparison of ESCO’s monthly balances finds that Georgia’s national electricity consumption increased by 240.3 million kWh while domestic generation fell by 74.3 million kWh. Together, these changes reconcile almost exactly with the increase in net imports.
  • The largest deterioration occurred in the second quarter, when net exports fell from 420.7 million kWh to 25.7 million kWh. Evaluating new generation therefore requires understanding what energy it adds to the system and when, rather than considering announced megawatts alone.

New energy projects in Georgia are often introduced through a single number: the capacity to be built. On 13 November, BM.ge published an interview describing an investor’s plans for an Imereti wind project and its associated substation. The company representative said full commercial operation was planned for early 2028. That is a development intention, not electricity already delivered to the system. [3]

The announcement raises a more useful economic question: what problem should new investment address in the existing electricity balance? Looking only at imports suggests a relatively modest change. ESCO’s figures show that electricity imports increased by about 5% in the first nine months of 2026 compared with the same period of 2025. Yet imports minus exports increased by about 51%. These figures are not contradictory. They describe different aspects of the system. [1–2]

BTU’s analysis connects cross-border flows with domestic output, consumption and generation sources. Its principal finding is that Georgia’s additional net requirement for external electricity appeared mainly through the disappearance of export volumes, rather than a sharp surge in purchases. Understanding that distinction matters for energy policy and for businesses whose expansion depends on dependable electricity supply.

Why the import figure is not enough

Net imports are calculated by subtracting exports from imports. When a country buys electricity during one period and sells it during another, purchases alone cannot describe its overall external position. Equally, the existence of exports does not mean that domestic electricity is abundant in every month.

Georgia imported 1,132.7 million kWh and exported 510.8 million kWh in January–September 2025. In the equivalent 2026 period, imports reached 1,186.5 million kWh, while exports fell to 250.0 million kWh. Purchases therefore increased by only 53.8 million kWh, but sales volumes decreased by 260.8 million kWh. Together, these movements raised net imports by 314.6 million kWh. [1–2]

Indicator, million kWh January–September 2025 January–September 2026 Change
Domestic generation 10,382.6 10,308.4 −74.3
National consumption 11,004.6 11,244.9 +240.3
Imports 1,132.7 1,186.5 +53.8
Exports 510.8 250.0 −260.8
Net imports 621.9 936.5 +314.6

 

Source: ESCO’s actual electricity balances for 2025 and 2026; monthly aggregation and changes calculated by BTU. National consumption follows ESCO’s full balance definition, including relevant system losses and own use in addition to final customer supply. Transit is excluded from the trade measures. Rounding can produce differences in the final displayed digit.

BTU calculates that lower exports account for approximately 83% of the deterioration in the net position. This is an accounting decomposition, not a claim that export decisions were an independent economic cause. Production, demand, prices, network availability and trading decisions interact. The table identifies where the change appeared; further evidence would be needed to separate all its causes.

Physical energy and monetary results should be distinguished. Electricity purchased and sold at different times can have different prices. Assessing revenue and expenditure therefore requires combining volumes with transaction prices and contractual terms.

That distinction is especially important for interpreting economic headlines. A smaller export volume may reduce a commercial opportunity, but its value cannot be read directly from kilowatt-hours. Likewise, a larger import volume is not by itself evidence of a failed trading strategy. The relevant question is what supply was available, what domestic demand required and what alternatives existed at the time.

Demand increased while the production total barely moved

The change in the external balance can be verified through a second route. National electricity consumption increased by 240.3 million kWh, or approximately 2.2%, over the nine-month comparison. Domestic generation declined by 74.3 million kWh, or about 0.7%. The combination of additional demand and reduced production produces a gap of 314.6 million kWh, matching the increase in net imports. [1–2]

This reconciliation gives the central finding a stronger foundation. One route uses imports and exports; the other uses consumption and generation. Separately aggregating these figures leads to the same result, apart from a negligible monthly rounding difference in the source. It does not establish causation, but it prevents the analysis from treating different sides of one balance as unrelated developments.

The small fall in total production also conceals much larger changes within the generation portfolio. Hydropower output fell by 257.0 million kWh, while thermal generation increased by 145.1 million kWh. The residual contribution of other generation increased by 37.6 million kWh. Rising thermal output and other generation therefore offset much of the hydro decline.

Domestic generation component January–September 2025 January–September 2026 Change
Hydropower 8,679.5 8,422.5 −257.0
Thermal power 1,638.4 1,783.5 +145.1
Other generation, calculated residual 64.8 102.4 +37.6
Total generation 10,382.6 10,308.4 −74.3

 

Unit: million kWh. Source: ESCO; BTU calculations. Other generation equals total output minus hydro and thermal generation. The residual preserves comparability despite differences in the source categories; the method explains the classification.

The economic significance is straightforward. An almost unchanged production total can be supplied through a different combination of technologies. Those sources have different operating conditions. Monitoring the composition alongside the total shows which sources provide the offset when another component declines, and identifies where further operational research would be useful.

This is why monitoring the total alone can understate the change in the system. The relevant issue is not simply whether more electricity was produced, but which sources supplied it and how that production matched consumption. A portfolio that compensates for one source’s decline may preserve supply while changing other requirements. Establishing those requirements precisely calls for operational and cost evidence beyond the monthly balance.

The largest change occurred in the second quarter

The nine-month comparison becomes more informative when separated into quarters. Net imports increased by 103.8 million kWh in the first quarter. In the third quarter, the position improved: a small net import requirement in 2025 became net exports in 2026. That improvement amounted to 184.2 million kWh.

The second quarter produced the largest deterioration. In April–June 2025, exports exceeded imports by 420.7 million kWh. In the same months of 2026, that surplus was only 25.7 million kWh, a reduction of 395.1 million kWh. The loss of this surplus outweighed the third-quarter improvement and, together with the first-quarter deterioration, explains the nine-month result.

The domestic composition of the second quarter adds another layer. Hydropower generation declined by 559.3 million kWh. Thermal output increased by 193.2 million kWh, while other generation also provided a partial offset. Total output consequently fell by 354.0 million kWh. Consumption increased by 41.0 million kWh in the same period. Reduced production plus additional demand reconcile with the 395.1 million kWh reduction in net exports.

The change was therefore not simply a matter of buying more electricity. The system produced a much smaller external surplus in a period that had delivered a substantial positive balance a year earlier. Such differences can disappear behind a nine-month or annual headline. They also matter for decisions: growing demand, declining production and changing sales opportunities are not interchangeable problems, even though they can all affect the same final net balance.

The quarterly comparison is descriptive rather than seasonally adjusted. It does not establish an unchanging seasonal rule from two observations. Its value is more immediate: it identifies the period and production components that account for the observed change, giving subsequent operational research a precise question to investigate.

What this means for new investment

The new report on the Imereti wind project gives this analysis a practical setting. In BM.ge’s interview, the investor’s representative discusses both the power plant and a new high-voltage substation. Considering these together is sensible: generating electricity and moving it into the system are distinct but interdependent capabilities. The schedule remains the company’s plan; subsequent implementation will establish what is delivered. [3]

BTU’s analytical assessment is that the most useful investment question is how a project addresses the system’s actual requirement. That requires an expected production profile by month and hour, network-connection readiness and an understanding of how the project operates alongside other generation. Comparing nominal capacity with an energy shortfall is insufficient: megawatts measure capacity, while kilowatt-hours measure energy produced over time.

The analysis identifies a measured system-level issue against which a new project can be evaluated. Additional generation can create value by expanding the annual total, but also by reducing the need to replace other sources during useful periods. Quantifying that contribution requires project-specific evidence; mechanically transferring an existing plant’s performance to a new development would not establish it.

For businesses, the conclusion extends beyond the electricity industry. Expansion in manufacturing, retail, hospitality or digital services creates electricity requirements. Investment appraisal should consider how new demand, generation and network access fit together. The national balance helps explain the importance of that connection, without determining a particular firm’s future electricity bill.

Georgia’s nine-month change can therefore be expressed plainly: imports grew moderately, while additional consumption and lower generation were reflected in a much smaller exportable surplus. Sound investment decisions need to recognize that distinction. Additional megawatts matter; their economic contribution ultimately depends on when and how reliably they become useful energy.

Questions and answers

Does increasing net electricity imports mean shortages or blackouts? It means national consumption exceeded domestic generation by a larger amount over the measured period. It does not establish interrupted supply or unmet demand; external flows cover the accounting difference.

Do falling electricity exports prove poor commercial decisions? No. Production, domestic requirements, prices and network conditions can change export flows. This study decomposes the physical balance rather than evaluating a specific trader’s decisions.

Can household savings from a new wind plant already be calculated? That requires its actual output, contractual prices, network costs and tariff arrangements. An investment announcement does not supply those inputs.

Why compare nine months in both years? Matching periods avoids comparing an incomplete year with a full year. The research does not forecast the fourth quarter of 2026 and should be updated when new data become available.